Do you manufacture clothing in South Korea, or just ship there?
We make it in Bangladesh and ship it to South Korea; we have no production in Korea. Your order is cut, sewn and finished on our own floor in Narayanganj, then delivered DDP to your address in Korea, so you deal with the factory itself, not a trading company. A brand whose stockists expect a Made in Korea label should look for a Korean workshop instead, and that is worth settling before sampling starts. For Korean labels we produce tees, hoodies, joggers, activewear and loungewear, with a floor of 150 pieces for every style and colourway and with organic cotton available under our GOTS certification (RSC 9687, scope certificate on request). Every Korean order is inspected before it leaves for Busan or Incheon by Walter Meyer, who leads our QC with 38 years in the trade. Korea's LDC preference also depends on the garment's materials and a certificate of origin (see the next answer), while the CEPA completes its remaining steps.
Is the Korea-Bangladesh CEPA actually in effect? What duty applies right now?
No, not yet: the CEPA was concluded in principle on 4 August 2026, which means the negotiators agreed the substance; it has not yet been ratified or brought into force. Until it is, Bangladesh-made clothing enters Korea under Korea's own preferential tariff for least developed countries, which has historically kept the large majority of tariff lines duty-free for LDCs, well below Korea's standard 8–13% MFN apparel rate. That preference is not automatic. Korea's regulations on it ask the importer for a certificate of origin issued by the exporting government or a body it designates, and where imported materials are used, their value, leaving out any Korean-made materials, must not exceed 60% of the garment's FOB price. Without that certificate the preferential rate cannot be claimed, so raise it when you ask for a quote. Our DDP quote uses the rate that applies on the day, not the eventual CEPA terms, and we will update this page as ratification moves.
Will Bangladesh's LDC graduation raise my Korea import costs?
Not necessarily: the CEPA, concluded in principle on 4 August 2026, is meant to replace LDC treatment, but a gap is possible. Graduation is now scheduled for 24 November 2029, and whether Korea keeps Bangladesh on preferential terms after that has rested on bilateral talks, not an automatic extension. The CEPA covers close to 97% of Bangladeshi goods, with ready-made garments named among the industries set to benefit. The UN pushed graduation back from 2026 at Bangladesh's request: its Committee for Development Policy judged a delay appropriate, and the General Assembly granted three years on 29 October 2026. The real risk is a stretch of time between graduation and the CEPA entering into force, and neither Korea's timetable nor the UN's is in our hands. If one opens, your DDP quote will show the rate that actually applies. For the wider picture beyond Korea, read what LDC graduation actually changes for your orders.
How much Korean VAT will I pay, and who's responsible for it?
10% of the customs value plus any duty, collected at the Korean border under Articles 29 and 30 of the Value-Added Tax Act. In Korea that customs value covers the goods plus freight and insurance as far as the port of entry. Where the LDC preference takes the duty to nil, VAT is 10% of that customs value: on 500 tees landed at the border at $6.00 each ($3,000), that's $300. If the preference could not be claimed and duty applied, the duty would be added to the base first, and the VAT would rise with it. The Act makes the person who imports the goods liable for the tax, so ask us who will be named as importer on the Korean entry for your order. If that is your Korean business, the Act lets you deduct the import VAT as input tax. Because we quote Korean orders DDP, the 10% is already counted in the figure we give you.
What's the minimum order for a South Korean clothing brand?
150 pieces per style and per colour; a Korean brand starts from the same floor as any other buyer. The colour rule is what shapes a first Korean order: 450 tees in one colourway come from one fabric and dye lot, while 150 each in three colours means three lots and is priced that way. So a Korean capsule of two hoodie styles, each in black and in grey, begins at 600 pieces, not 300. Korea's 10% VAT is worked out on the customs value plus any duty, so a smaller run carries a smaller VAT bill at the same rate; the minimum does not change what percentage you pay. The 150-piece floor holds when you choose organic cotton under our GOTS certification (RSC 9687, scope certificate on request) as well. To plan a Korean launch before asking us for a quote, enter your styles, colours and pieces per colourway in our free MOQ calculator, which shows the total run and a suggested size split.
How long does delivery to South Korea take?
Sampling takes about ten days, bulk production forty to fifty days once the pre-production sample is approved, then freight on top. Sea freight to Korea is comparatively fast given the shipping lanes between South and East Asia, typically landing at Busan or Incheon within three to four weeks of leaving Chattogram, often via a transshipment hub like Singapore or Colombo. Air freight adds roughly five to seven days door to door and suits a launch date or a first order where speed matters more than cost. We ship DDP either way, so VAT and clearance at the border are handled on our side. The mode you pick shows up in the tax line too, because Korea normally counts freight in the customs value, so the dearer air freight usually raises the base the 10% VAT is worked out on. Ask us to quote both ways. From order to your door, plan on about 70 days by air.
Can you make clothing that fits Korean customers' sizing?
Yes. Collective Studio grades a size chart from your own sample measurements rather than from a standard Western block, so a medium fits the way your Korean customers expect. If your customers find US or European grading large through the shoulder, chest or sleeve, the fix is to set the fit on the sample, not to relabel sizes. Send a garment whose fit you already like, or your existing size chart, and we measure it and build the pattern from those numbers. The fit sample is corrected until you approve it, then sealed as the reference for bulk and for every reorder, so later runs do not drift. Sizes can be graded to alpha or numeric conventions, and because the 150-piece minimum applies per style and colour with the size split left to you, you can weight the run to your own sales. Fabric is compacted before cutting, so the measurements you approve survive the first wash.
What is the Korea-Bangladesh CEPA, and what will it cover?
The Korea-Bangladesh CEPA is a Comprehensive Economic Partnership Agreement whose negotiations were concluded in principle on 4 August 2026, covering close to 97% of Bangladeshi goods, with ready-made garments named among the industries set to benefit. Korea's Trade Minister and Bangladesh's Commerce Minister announced it jointly. Concluded in principle means the negotiators agreed the substance; the treaty still has to be signed, ratified and brought into force before its tariff terms apply. For comparison, Japan's economic partnership agreement with Bangladesh moved from agreement in principle in December 2025 to signing on 6 February 2026. Until the CEPA is in force, clothing from Bangladesh enters Korea under Korea's preferential tariff for least developed countries, claimed with a certificate of origin. The CEPA matters most for the years after Bangladesh graduates from LDC status on 24 November 2029. Collective Studio quotes Korean orders DDP at the rate that applies on the day.